<?xml version="1.0" encoding="UTF-8"?>
<oembed>
  <version>1.0</version>
  <type>link</type>
  <title>Critical-Path Limiting-Step Offset Scheduling (Grove Ch. 1, 1983 / Vintage 1995) (New Zealand) — $20–45/hr Pods | ANDYGROVE.SYSTEMS</title>
  <author_name>ANDYGROVE.SYSTEMS Continuing Professional Development &amp; Operations Research Collective</author_name>
  <author_url>https://andygrove.systems/education</author_url>
  <provider_name>ANDYGROVE.SYSTEMS — High Output Operations &amp; Fresh Preprints Upskilling Hub</provider_name>
  <provider_url>https://andygrove.systems</provider_url>
  <cache_age>86400</cache_age>
  <thumbnail_url>https://andygrove.systems/og-card.png</thumbnail_url>
  <thumbnail_width>1200</thumbnail_width>
  <thumbnail_height>630</thumbnail_height>
  <url>https://andygrove.systems/new-zealand/critical-path-limiting-step-scheduling</url>
  <description>Remote R&amp;D pods ($20–45/hr, 10–25 hrs/wk) in Critical-Path Limiting-Step Offset Scheduling (Grove Ch. 1, 1983 / Vintage 1995) for Engineering Science &amp; Operations Research (University of Auckland Dept. of Engineering Science) specialists in New Zealand (University of Auckland (Dept. of Engineering Science — world-leading OR group), University of Canterbury, Victoria University of Wellington, Otago). Law: T_lead = max_{π ∈ Paths} ∑_{j ∈ π} W_j,   t_start(k) = T_lim − W_k. | Fresh Preprints: https://andygrove.systems/preprints | 42-Hr CPD Hub: https://andygrove.systems/education (Independent; not affiliated with Intel Corporation or the Grove family)</description>
</oembed>