{
  "version": "1.0",
  "type": "link",
  "title": "Critical-Path Limiting-Step Offset Scheduling (Grove Ch. 1, 1983 / Vintage 1995) (New Zealand) — $20–45/hr Pods | ANDYGROVE.SYSTEMS",
  "author_name": "ANDYGROVE.SYSTEMS Continuing Professional Development & Operations Research Collective",
  "author_url": "https://andygrove.systems/education",
  "provider_name": "ANDYGROVE.SYSTEMS — High Output Operations & Fresh Preprints Upskilling Hub",
  "provider_url": "https://andygrove.systems",
  "cache_age": 86400,
  "thumbnail_url": "https://andygrove.systems/og-card.png",
  "thumbnail_width": 1200,
  "thumbnail_height": 630,
  "url": "https://andygrove.systems/new-zealand/critical-path-limiting-step-scheduling",
  "description": "Remote R&D pods ($20–45/hr, 10–25 hrs/wk) in Critical-Path Limiting-Step Offset Scheduling (Grove Ch. 1, 1983 / Vintage 1995) for Engineering Science & Operations Research (University of Auckland Dept. of Engineering Science) specialists in New Zealand (University of Auckland (Dept. of Engineering Science — world-leading OR group), University of Canterbury, Victoria University of Wellington, Otago). Law: T_lead = max_{π ∈ Paths} ∑_{j ∈ π} W_j,   t_start(k) = T_lim − W_k. | Fresh Preprints: https://andygrove.systems/preprints | 42-Hr CPD Hub: https://andygrove.systems/education (Independent; not affiliated with Intel Corporation or the Grove family)"
}