{
  "version": "1.0",
  "type": "link",
  "title": "CPD-04: L0–L3 Task-Relevant Maturity (TRM), Wilson 95% Evals & Blast-Radius Delegation Gates (Netherlands CPD Upskilling) | ANDYGROVE.SYSTEMS",
  "author_name": "ANDYGROVE.SYSTEMS Continuing Professional Development & Operations Research Collective",
  "author_url": "https://andygrove.systems/education",
  "provider_name": "ANDYGROVE.SYSTEMS — High Output Operations & Fresh Preprints Upskilling Hub",
  "provider_url": "https://andygrove.systems",
  "cache_age": 86400,
  "thumbnail_url": "https://andygrove.systems/og-card.png",
  "thumbnail_width": 1200,
  "thumbnail_height": 630,
  "url": "https://andygrove.systems/netherlands/cpd-04",
  "description": "Open-access Continuing Professional Development (7 PDH / CPE / CPD Hrs) for professionals in Netherlands (TU Eindhoven (TU/e — Industrial Engineering & Eurandom), TU Delft, Erasmus University Rotterdam (Econometric Institute), University of Twente, Tilburg, VU Amsterdam), built on fresh 2023–2026 preprints (https://andygrove.systems/preprints): Operationalize Grove’s Chapter 9 Task-Relevant Maturity via finite-sample Wilson 95% lower confidence bounds, SPC acceptance sampling, single human Owner accountability, and hard L1 irreversible action gates. | Fresh Preprints: https://andygrove.systems/preprints | 42-Hr CPD Hub: https://andygrove.systems/education (Independent platform; not affiliated with Intel Corporation or the Grove family)"
}